WDM produced a factory tour film showing Tredwell’s ePlan-to-floor process, from drawing office to final testing. The full cut sits inside head of sales Martin’s one-to-one sales presentations, replacing a phone-shot walkthrough. Tightly cropped, IP-safe edits cover the website, LinkedIn, the Shannon facility opening in October 2026 and the data centre show in November 2026. A drone GIF of the Shannon building also went out on the opening invites.
Testimonial from Tredwell
“The finished product is better than what I imagined on day one. We couldn’t be happier with what we’ve got for Tredwell. I assumed you’d come in, point the camera, record and that was it. Instead the team was talking to our operators individually: what do you do, how do you do it, why do you do it. They really took an interest and wanted to understand the process, and it comes across in the video.
There’s a part where the guys do the pull test on the wiring. That was never part of our plan. Your team picked up on something I’d overlooked, and if I show that to anyone who knows panels, it’s immediately going to resonate. Turnaround was sooner than I needed, and the professionalism of the guys who came out was brilliant.”